Gửi tin nhắn
Zhangjiagang Hengli Technology Co.,Ltd 86--13862229156 sparkxu308@gmail.com
11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

  • Điểm nổi bật

    automatic shrink wrap machine

    ,

    shrink wrapping machine

  • Tên
    máy móc bao bì thu nhỏ
  • Thời gian cho một lần giảm
    4-6S
  • Place of Origin
    Jiangsu China
  • Hàng hiệu
    Xingyu
  • Chứng nhận
    ISO9001-2000
  • Model Number
    G800
  • Minimum Order Quantity
    1
  • Packaging Details
    According to customers' requests
  • Delivery Time
    60days
  • Payment Terms
    30%advanced payment by TT,70% before shipment
  • Supply Ability
    20 per month

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

 

 

 

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

 

G400 shrinking machine for making pipe  before done in drawing machine

 

 

Quick Detail:

 

1. Type: pipe-shrinking machine

2. Model Number: G800

3. Used in: G800 pipe-shrinking machine is for making pipe before drawing machine,the material can be any metal.G400 pipe-shrinking machinecan roll pipe diameter of 16--40mm to 10--35mm.

 

 

The technical parameters:

 

Operating Instructions:

 

 

No. Name Technical Parameters Unit
1 Range of Reduction
 for Diameter
10 ~ 35 mm
2 Diameter of Mother Tube 16 ~ 40 mm
3 Time for
one reduction
4 ~ 6 s
4 Motor 11 kw
5 System pressure 52 Mpa
6 Machine Size 900*1150*1310 mm
7 Machine weight 1750 kg

 

 

G400 pipe-shrinking  machine operations and processes

 

 1. Take out the mould by rotating it according to arrow direction, no reverse rotation allowed.

 2. Moulds can be changed according to different specifications.

3. Head length can be adjusted by middle adjusting rod, loose the belt wheel screw,  adjust the length and fasted the screw again.

4. Pour in 80% diesel and 20% engine oil, as the oil pump capacity is big, oil box entrance valve should be fully open, machine valve fix a little oil is ok.

5. After the umbrella-block wear down and the gap becomes big, you can put a gasket between umbrella block and the mould, but the gasket can not be too thick so that machine won't get stuck.

6. The lubrication oil should be changed after it gets dirty.

 

Safety Precautions

 

1,Place the machine on a fixed horizontal surface and the calibration level, the machine is stable.

2,Check the oil level before use, to keep the hydraulic oil target position in 1/2 or more.

3,Check the motor rotation, such as rotation error, please adjust the power wiring.

4,When the state machine automatically, please confirm the accuracy of the input data.

5,When the machine is operating, safety, the hands, the body, such as near the action area is prohibited.

6,People must be dedicated machine operation, and the operator should be able to reach and stand within the scope of the emergency stop button.

7,Machine must be grounded.

8,When remove mold, must turn off the power.

9,Please refuel oil regularly.

10,Keep the machine and the environment clean.

11,Not allowed to work in the dust, conductive particles and acids and other places.

 

Factory picture:

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine 0

 

Part of the machine:

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine 1

ga('send', 'pageview');